Emergency lighting

Searching...

    Emergency lighting refers to lights that indicate and illuminate escape routes. These remain operational in the event of a power outage. Emergency lighting is installed in accordance with TRVB E 102, ÖVE/ÖNORM E 8002, EN 1838, DIN EN 50172 (VDE 0108-100), and DIN VDE 0100-560. The Dialux or Relux software programs are used to calculate the emergency lighting.

    No components are created during this phase of the project.

    In this phase of the project, the location of the central battery or group battery is determined.

    In this phase of the project, the emergency lights are positioned based on the calculations.

    Presentation

    For more information on the central battery/SIB sub-distribution panel, see

    For more information on the central battery/SIB sub-distribution panel, see

    Distribution list.

    Distribution list.

    img 11

    img 11

    img 13

    img 13

    Features

    Labeling

    Instructions

    Safety lighting falls under the "luminaires" category.

    The design of safety lighting is therefore carried out in the same way as the design of general lighting.

    ArchiCAD Content

    Presentation

    In addition to the floor plans showing the safety lighting, there is often also a

    In addition to the floor plans showing the safety lighting, there is often also a

    Color scheme

    Color scheme

    Features

    • Circuit
    • Distribution panel

    Labeling

    • BS_Leuc_Type
    • BS_Leuc_Circuit

    Instructions

    During this phase, the plans and models remain unchanged from Draft.
    ArchiCAD Content

    In this phase of the project, the positions from the submission are adopted, and the emergency lighting is finally positioned.

    In this phase, the design and model representations remain unchanged from Design phase.

    Germany Content

    Switzerland Content

    Features

    • Circuit
    • Distribution panel

    Labeling

    • BS_Leuc_Type
    • BS_Leuc_Circuit

    Instructions

    During this phase, the plans and models remain unchanged from the Draft.
    ArchiCAD Content

    upgrade.png
    Dieser Inhalt steht leider nur unseren Pro-Anwendern zur Verfügung.
    Sollten Sie Interesse haben, den gesamten Artikel zu lesen,
    Sie den Pro-Account oder werden Sie Pro-Anwender.