    Air duct insulation layers are responsible for retaining the energy of the air within the ducts. To minimize the temperature drop of the treated air from the source to the end user, different insulation materials are used depending on the specific application.

    At this stage, the insulation of air ducts is not yet shown.

    At this stage, the insulation of air ducts is not yet shown.

    From this stage onward, insulation is shown. In addition, measures are taken to prevent the spread of smoke and fire, in accordance with DIN EN 15501-2 and 3—Special Components.

    Presentation

    Plan view

    Plan view

    Model representation

    Model representation

    Features

    The following characteristics are defined in this phase:

    • Geometry of Fire-Rated Cladding
    • Loads 
    • Definition of the fire resistance class

    Labeling

    The following fire resistance ratings can be specified for the component: EI90, EI45, etc.

    Ideally, elements should be labeled using a family that retrieves the necessary information and characteristics of the insulation from the properties.
    ArchiCAD Content

    Instructions

    Installation of the insulation:

    After selecting the air duct, the button for creating the insulation is located in the Modify | Air Ducts tab.

    Depending on the requirements, the insulation can be installed inside or outside the air duct.

    Isolierung_erstellen.png

    For more information, see the Autodesk Revit Help article "Adding Exterior and Interior Insulation to Ducts."

    The type of exterior insulation and its thickness can be specified according to requirements.

    Isolierungsstaerke.png
    ArchiCAD Content

    In this phase, the plans and models of the insulation remain unchanged from those created during the design phase.

    Presentation

    In this phase, the plans and models of the insulation remain unchanged from those created during the design phase.

    Features

    The following characteristics are defined in this phase:

    • Adjustment of the geometry of the fire-resistant linings in accordance with the duct network calculation
    • Adjustment of the geometry of the duct insulation

    Labeling

    The labeling of the insulation layer or cladding on the floor plan should include the following fire safety requirements:

    • Fire resistance class
    • Insulation thickness
    ArchiCAD Content

    Instructions

    Generally, the insulation—including the material, thickness, etc.—is described in more detail in the bid specifications.